Interator Identifies 3 Bundles, but All load into same row in Google Sheet

I am capturing Sub-Items from Monday.com via Make and want them to update within a certain set of rows in Google Sheets. Currently the Iterator is capturing 3 Bundles, but is trying to put them into the same row (overwriting the previous one) instead of adding them second bundle to a next available row.
Screenshot 2024-10-02 at 3.51.45 PM


Screenshot 2024-10-02 at 3.51.45 PM

Need help with what i am doing wrong.

Can you share your scenario? Is it possible that your configuration is pointing to a specific row/cell?

Also, how do you know that it overwrote a cell instead of only one bundle bein processed? I’m assuming you probably saw 3 operations, but just double-checking that it’s not an execution problem.

L